In this 3rd practice, you will carry out the assembly of the group of switches and will carry out experiments on the circuits OR, NOR and OR Exclusive.

1. - PREPARATION OF THE COMPONENTS

To carry out the exercises envisaged in this practice, you will use the following components which you eûtes in your possession :

  4 switches (switches 1 circuit - 2 positions), “to see figure 1”

  1 integrated circuit MM 74C32,

  1 integrated circuit MM 74C02,

  1 integrated circuit MM 74C86,

  1 roller of welding,

  1 integrated circuit MM 74C00 which you had at the time of the preceding lesson (2nd practice). You will be useful yourselves thus of a few pieces of isolated rigid wire already used in the preceding experiments and will prepare you the new ones by taking them on the braid in your possession.

2. - ASSEMBLY OF THE GROUP OF SWITCHES

To carry out this work, respect the following indications :

  Take a switch and place it on the printed circuit so that the visible notch on the cylindrical higher part is turned on the side opposed to inscription SW0 as clearly indicated figure 1-b.

Montage_des_4_interrupteurs.jpg

 

 

 

 

 

 

 

 

 

 

 

  After you to be assured that the switch is well inserted into its place and while maintaining it well in contact with the plate, carry out the welding of the 7 terminals.

  By using the same method, lay out the 3 other switches with their respective site located on the printed circuit by initials SW1, SW2, SW3 and carry out the welding of the terminals on the corresponding copper pastilles.

2. 1. - CONTROL NOT UNDER TENSION

Before carrying out this control, you ensure that the four switches are well directed in the way indicated figure 1-a. Check that the weldings are carried out correctly.

Carry out then the following operations :

  Lay out the levers of the four switches in manner that they are directed all the four towards symbol 0 deferred on the printed circuit as you see it in the figure 1-a.

  Prepare the controller for the measurement of resistance gauges W x 1000. Put a test probe on one of the contacts of the group of connectors located by the sign “-” and with the other point touch contact SW0 of the group of connectors. The needle of the apparatus must indicate a value of null resistance.

   By maintaining the test probes on the same contacts, move the lever of switch SW0 towards symbol 1 ; the needle must indicate in this case a value of infinite resistance.

   Now move the test probe which is on the contact “-” and put it on one of the contacts “+” by leaving the other point on contact SW0 ; the apparatus must indicate a value of null resistance.

   By maintaining the test probes of the controller on one of the contacts “+” and on contact SW0, put switch SW0 on the position located by symbol 0. The needle will indicate a value of infinite resistance.

With these tests, summarized in the points of measurement 1 and 2 of the table of figure 2, you finished the control of switch SW0.

Controle_hors_tension_du_groupe_d_interrupteurs.gif

Same manner, check successively switches SW1, SW2, SW3 while carrying out in the order indicated on the table of figure 2, measurements between the various points specified in the second column and by laying out the lever of the switch concerned alternatively on the positions 1 or 0 as indicated in the third column.

If one of the points of control did not give the result indicated in the last column of the table of figure 2, re-examine the assembly. Control the exact provision of the switches, the weldings carried out and ensure you that there are no cut tracks or short-circuit between close tracks.

When you obtain correct measurements for each switch, you will be able to carry out the operational test.

2. 2. - OPERATIONAL TEST

To carry out this test, you conform to the following instructions :

      lay out the levers of the 4 switches on position 0.

     by using 4 pieces of rigid wire isolated from 10 cm each one, connect between them the points of the group of connectors indicated below and illustrated figure 3.

Essai_du_groupe_inverseurs.jpg

     feed then the circuit, connect the cords red and black to the pile ; the four LED located by L0, L1, L2 and L3 remain extinct.

      move then the levers of the switches on position 1 ; in this case, the LED L0, L1, L2 and L3 ignite.

You now controlled the operation of the group of switches whose electric diagram is deferred in figure 4.

Schema_electrique_du_groupe_d_interrupteurs.gif 

The two positions, which the common contact of each switch can take, are located by symbol 1 and 0. Symbol 1 is associated the position making available on the group of connectors a “high” level of tension (+ 4,5 V), while the position represented by symbol 0 corresponds to a level of low tension (0 V).

You can, now, carry out the experiments practice of which the goal is to give the opportunity to you to familiarize you with the characteristics of the basic components used in the digital circuits.

Click here for the following lesson or in the synopsis envisaged to this end. Haut de page High of page